Project Completion Certificate (Ground Water)
Scheme ID: 20039829 Name of Scheme: Gadanpur &singlamau pws No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 3646 Base Year: 2033 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 05-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.599
2 HDPE 90 1.840
3 HDPE 110 .664
4 HDPE 125 .38
5 HDPE 140 .341
HSC Connection
Sno. Total Nos.
Other Details
2.52
0.00
2.55
04-Jun-2024
05-Jun-2024