Scheme ID: 20040135 Name of Scheme: Avavar No. of Villages: 4 No. of Habitation Covered: 3
Total Population Covered: 4933 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Dec-2023 Actual Date of Completion (Capex): 25-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.327
2 HDPE 90 1.772
3 HDPE 110 .734
4 HDPE 125 .219
5 HDPE 140 1.281
6 HDPE 160 .759
HSC Connection
Sno. Total Nos.
Other Details
346.13
0.00
347.30
06-Aug-2023