Project Completion Certificate (Ground Water)
Scheme ID: 20041463 Name of Scheme: ASTABAD WSS No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 3890 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 23-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 27.11/80.72 Astabad 26º 21' 9.598" N 82º 42' 34.158" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC ZA Tank 225/14 Astabad 26º 21' 9.598" N 82º 42' 34.158" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 13.83
2 HDPE Pipe PN-6: Class PE-100 75 4.02
3 HDPE Pipe PN-6: Class PE-100 90 1462
4 HDPE Pipe PN-6: Class PE-100 110 1.383
5 HDPE Pipe PN-6: Class PE-100 140 0.710
6 HDPE Pipe PN-6: Class PE-100 160 1.01
7 HDPE Pipe PN-6: Class PE-100 200 1.755
HSC Connection
Sno. Total Nos.
1 500
Other Details
3.24
0.00
3.22
23-Dec-2024
24-Dec-2024