| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20041474 | Name of Scheme: NARAYANPUR PRITAMPUR | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3650 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Nov-2024 | Actual Date of Completion (Capex): 19-Jun-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24/70.30 | NARAYANPUR PRITAMPUR | 26°31'11.17"N | 82°46'31.99"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 39/46 | NARAYANPUR PRITAMPUR | 26°31'11.17"N | 82°46'31.99"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC-Zink Alum Tank | 175/14 | NARAYANPUR PRITAMPUR | 26°31'11.17"N | 82°46'31.99"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 150 | 0.04 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 580 |