Project Completion Certificate (Ground Water)
Scheme ID: 20041625 Name of Scheme: PANDEY PAIKAULI No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Oct-2023 Actual Date of Completion (Capex): 14-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 28.09/52.73 DHARMA MUBARAKPATTI 26O 28' 53.17" N 82O28' 29.14" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 42/46 DHARMA MUBARAKPATTI 26O 28' 53.17" N 82O28' 29.14" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/14 DHARMA MUBARAKPATTI 26O 28' 53.17" N 82O28' 29.14" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.932
2 HDPE Pipe PN-6: Class PE-100 75 2.163
3 HDPE Pipe PN-6: Class PE-100 90 0.917
4 HDPE Pipe PN-6: Class PE-100 110 0.876
5 HDPE Pipe PN-6: Class PE-100 125 0.114
6 HDPE Pipe PN-6: Class PE-100 140 0.223
7 HDPE Pipe PN-6: Class PE-100 160 0.221
8 HDPE Pipe PN-6: Class PE-100 180 0.441
HSC Connection
Sno. Total Nos.
1 576
Other Details
249.75
0.00
247.09
09-Jul-2025
10-Oct-2025