Project Completion Certificate (Ground Water)
Scheme ID: 20041701 Name of Scheme: CHATURI PATTI WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3930 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 14-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBWELL 24.02/59.81 CHATURI PATTI 26º 32' 28.487" N 82º 20' 46.791" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 33/45 CHATURI PATTI 26º 32' 28.487" N 82º 20' 46.791" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/14 CHATURI PATTI 26º 32' 28.487" N 82º 20' 46.791" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Di Pipe K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 63 5.573
2 HDPE PN-6, PE-100 75 0.812
3 HDPE PN-6, PE-100 90 0.504
4 HDPE PN-6, PE-100 110 0.573
5 HDPE PN-6, PE-100 140 0.400
HSC Connection
Sno. Total Nos.
1 225
Other Details
2.06
0.00
2.35
02-Dec-2024
03-Dec-2024