Project Completion Certificate (Ground Water)
Scheme ID: 20041713 Name of Scheme: Talehpur No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 3075 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 29-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.21 M / 160.17 M Talehpur 26.518828 79.459665
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible Pump 650 LPM / 63 M Talehpur 26.518828 79.459665
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 16 M Talehpur 26.518828 79.459665
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.0135
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.7257
2 HDPE 90 2.462
3 HDPE 110 0.097
4 HDPE 125 110
5 HDPE 140 0.033
6 HDPE 160 0.165
HSC Connection
Sno. Total Nos.
1 648
Other Details
2.51
0.00
2.63
28-May-2024