Project Completion Certificate (Ground Water)
Scheme ID: 20041720 Name of Scheme: MIJHAURA WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 7250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 23-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.12/75.74 MIJHURA 26O 28' 47.769" N 82O 23' 40.612" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 63/46 MIJHURA 26O 28' 47.769" N 82O 23' 40.612" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/16 MIJHURA 26O 28' 47.769" N 82O 23' 40.612" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 10.414
2 HDPE Pipe PN-6: Class PE-100 75 3.939
3 HDPE Pipe PN-6: Class PE-100 90 1.612
4 HDPE Pipe PN-6: Class PE-100 110 0.628
5 HDPE Pipe PN-6: Class PE-100 140 0.404
6 HDPE Pipe PN-6: Class PE-100 160 0.511
7 HDPE Pipe PN-6: Class PE-100 200 1.944
HSC Connection
Sno. Total Nos.
1 815
Other Details
335.75
0.00
0.00
08-Jul-2025
08-Jul-2025