Project Completion Certificate (Ground Water)
Scheme ID: 20041820 Name of Scheme: PAHARPUR SULTANPUR WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2510 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 21-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/56.3 Paharpur Tappa 26º 29' 17.753" N 82º 53' 33.01" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 33/45 Paharpur Tappa 26º 29' 17.753" N 82º 53' 33.01" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC ZAT 150/14 Paharpur Tappa 26º 29' 17.753" N 82º 53' 33.01" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.178
2 HDPE Pipe PN-6: Class PE-100 75 3.441
3 HDPE Pipe PN-6: Class PE-100 90 1.61
4 HDPE Pipe PN-6: Class PE-100 110 0.601
5 HDPE Pipe PN-6: Class PE-100 125 0.53
6 HDPE Pipe PN-6: Class PE-100 180 0.303
7 HDPE Pipe PN-6: Class PE-100 200 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
HSC Connection
Sno. Total Nos.
1 226
Other Details
2.14
0.00
2.16
21-Mar-2025
22-Mar-2025