| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20043932 | Name of Scheme: GORAKHPUR HARBHANPUR GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 5504 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 28-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.00/127.80 | GORAKHPUR HARBHANPUR | 27.021598 | 79.495873 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 | 1150/65 | GORAKHPUR HARBHANPUR | 27.021598 | 79.495873 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 325 KL/ 18 M | GORAKHPUR HARBHANPUR | 27.021598 | 79.495873 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0015 | Rising main |
| 2 | DI | 150 | 0.0285 | Rising main |
| 3 | DI | 200 | 0.007 | Rising main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 4.29 | Distribution |
| 2 | HDPE | 63 | 8.82 | Distribution |
| 3 | HDPE | 110 | 1.28 | Distribution |
| 4 | HDPE | 140 | 0.75 | Distribution |
| 5 | HDPE | 160 | 0.741 | Distribution |
| 6 | HDPE | 180 | 0.502 | Distribution |
| 7 | HDPE | 200 | 0.315 | Distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 972 |