| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20044197 | Name of Scheme: Hardauli | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2310 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 27-Nov-2023 | Actual Date of Completion (Capex): 15-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 17.07/92.98 | Hardauli | 25.994092 | 80.637801 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible 12.5 HP | 480 LPM/63 M | Hardauli | 25.994092 | 80.637801 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/ 12 M | Hardauli | 25.994092 | 80.637801 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | .04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.693 | |
| 2 | HDPE | 75 | 1.290 | |
| 3 | HDPE | 90 | 0.380 | |
| 4 | HDPE | 110 | 0.384 | |
| 5 | HDPE | 125 | 0 | |
| 6 | HDPE | 140 | 0.347 | |
| 7 | HDPE | 160 | 0.14 | |
| 8 | HDPE | 180 | 0 | |
| 9 | HDPE | 200 | 0 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 449 |