Project Completion Certificate (Ground Water)
Scheme ID: 20044480 Name of Scheme: PANAIL BIHATA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2442 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Mar-2024 Actual Date of Completion (Capex): 24-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 22.1 TW 26.2111205 83.5053225
2 Plain Pipe 150mm 61.6 TW 26.2111205 83.5053225
3 Plain Pipe 200mm 42.07 TW 26.2111205 83.5053225
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 525/49 TW 26.2111205 83.5053225
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 150/16 OHT 26.2111205 83.5053225
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 2.62
2 HDPE Pipe PN-6: Class PE-100 75 0.59
3 HDPE Pipe PN-6: Class PE-100 90 0.64
4 HDPE Pipe PN-6: Class PE-100 110 0.3
5 HDPE Pipe PN-6: Class PE-100 125 0.38
6 HDPE Pipe PN-6: Class PE-100 160 0.34
7 HDPE Pipe PN-6: Class PE-100 180 0.41
HSC Connection
Sno. Total Nos.
1 322
Other Details
2.35
1.93
1.73
11-Dec-2025
24-Feb-2026