Project Completion Certificate (Ground Water)
Scheme ID: 20044677 Name of Scheme: PHOOLPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2647 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 15-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 24/242.69 phoolpur 25.715374 82.651120
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 560 Phoolpur 25.715201 82.650953
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 Phoolpur 25.714401 82.642201
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 180 0.486
2 HDPE 160 0.309
3 HDPE 140 0.462
4 HDPE 110 0.850
5 HDPE 63 3.045
6 HDPE 75 1.946
7 HDPE 90 1.482
HSC Connection
Sno. Total Nos.
1 406
Other Details
192.99
192.99
176.32
15-May-2025
16-May-2025