Project Completion Certificate (Ground Water)
Scheme ID: 20044997 Name of Scheme: NASIRPUR KALA WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 14
Total Population Covered: 2450 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 19-Mar-2023 Actual Date of Completion (Capex): 02-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 200mm 18.05 TW 25.845255 83.3519934
2 Plain Pipe 200mm 49.55 TW 25.845255 83.3519934
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar submersible Pump 600/45 TW 25.845255 83.3519934
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 150/12 OHT 25.845255 83.3519934
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.62
2 HDPE Pipe PN-6: Class PE-100 75 0.4
3 HDPE Pipe PN-6: Class PE-100 90 0.14
4 HDPE Pipe PN-6: Class PE-100 110 0.24
5 HDPE Pipe PN-6: Class PE-100 140 0.44
6 HDPE Pipe PN-6: Class PE-100 160 0.15
HSC Connection
Sno. Total Nos.
1 400
Other Details
2.53
2.10
1.97
07-Aug-2025
02-Feb-2026