| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20045020 | Name of Scheme: BHATIKALA WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 12 |
| Total Population Covered: 2889 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Mar-2023 | Actual Date of Completion (Capex): 14-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Depth of Strainer (m) | 18.03 | TW | 25.964457 | 83.387599 |
| 2 | Depth of Plain Pipe (m) | 105.93 | TW | 25.964457 | 83.387599 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 700/44 | TW | 25.964457 | 83.387599 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc tank | 150/12 | OHT | 25.964461 | 83.387596 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K7 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 63 | 6.18 | |
| 2 | HDPE PN6 PE100 | 75 | 0.96 | |
| 3 | HDPE PN6 PE100 | 90 | 1.28 | |
| 4 | HDPE PN6 PE100 | 110 | 0.484 | |
| 5 | HDPE PN6 PE100 | 140 | 1.09 | |
| 6 | HDPE PN6 PE100 | 160 | 0.413 | |
| 7 | HDPE PN6 PE100 | 200 | 0.021 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 415 |