Project Completion Certificate (Ground Water)
Scheme ID: 20045020 Name of Scheme: BHATIKALA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 2889 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Mar-2023 Actual Date of Completion (Capex): 14-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Strainer (m) 18.03 TW 25.964457 83.387599
2 Depth of Plain Pipe (m) 105.93 TW 25.964457 83.387599
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 700/44 TW 25.964457 83.387599
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc tank 150/12 OHT 25.964461 83.387596
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 6.18
2 HDPE PN6 PE100 75 0.96
3 HDPE PN6 PE100 90 1.28
4 HDPE PN6 PE100 110 0.484
5 HDPE PN6 PE100 140 1.09
6 HDPE PN6 PE100 160 0.413
7 HDPE PN6 PE100 200 0.021
HSC Connection
Sno. Total Nos.
1 415
Other Details
2.69
2.69
0.00
14-Jan-2025
15-Jan-2025