Project Completion Certificate (Ground Water)
Scheme ID: 20047223 Name of Scheme: BHAGAUTI PUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 3306 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 09-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 24M/121.54 BHAGAUTI PUR 26.4934 82.57545
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 12.5HP 650LPM/44 BHAGAUTI PUR 26.4934 82.57545
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200 K.L/ 14 Staging 26.49352 26.49352 82.5779
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Di-k-7 125 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6: Class PE-100 90 1.969
2 PN-6: Class PE-100 75 0.467
3 PN-6: Class PE-100 63 11.503
4 PN-6: Class PE-100 110 2.469
5 PN-6: Class PE-100 140 0.403
HSC Connection
Sno. Total Nos.
1 532
Other Details
2.35
2.86
2.86
09-Jan-2025
10-Jan-2025