| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20047223 | Name of Scheme: BHAGAUTI PUR Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 10 |
| Total Population Covered: 3306 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Nov-2023 | Actual Date of Completion (Capex): 09-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of tubewell assembly | 24M/121.54 | BHAGAUTI PUR | 26.4934 | 82.57545 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | ACsubmersible pumping 12.5HP | 650LPM/44 | BHAGAUTI PUR | 26.4934 | 82.57545 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 200 K.L/ 14 Staging | 26.49352 | 26.49352 | 82.5779 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Di-k-7 | 125 | 0.032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6: Class PE-100 | 90 | 1.969 | |
| 2 | PN-6: Class PE-100 | 75 | 0.467 | |
| 3 | PN-6: Class PE-100 | 63 | 11.503 | |
| 4 | PN-6: Class PE-100 | 110 | 2.469 | |
| 5 | PN-6: Class PE-100 | 140 | 0.403 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 532 |