Project Completion Certificate (Ground Water)
Scheme ID: 20047560 Name of Scheme: SAIDAPUR Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 13
Total Population Covered: 6028 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 10-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well assembly 122.8/30 Saidapur 26.391225 82.611042
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K7 200 35
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90mm dia HDPE Pipe 90 1.29
2 75mm dia HDPE Pipe 75 1.5
3 63mm dia HDPE Pipe 63 21.62
4 110mm dia HDPE Pipe 110 1.44
5 140mm dia HDPE Pipe 140 2.73
6 160mm dia HDPE Pipe 160 2.90
7 200mm dia HDPE Pipe 200 0.59
HSC Connection
Sno. Total Nos.
1 872
Other Details
4.62
4.63
4.63
10-Sep-2026
11-Sep-2026