Project Completion Certificate (Ground Water)
Scheme ID: 20047572 Name of Scheme: PALAI KALYANPUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 5030 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 06-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well assembly 30/98.8 Palai kalyanpur 26.446948 82.646752
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pump 60.24/46 Palai kalyanpur 26.446949 82.646753
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 275/16 Palai kalyanpur 26.4469452 82.646755
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K7 150 22.80
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90MM dia HDPE Pipe 90 1.24
2 75MM dia HDPE Pipe 75 3.47
3 63MM dia HDPE Pipe 63 18.83
4 110MM dia HDPE Pipe 110 1.89
5 140MM dia HDPE Pipe 140 0.21
6 160MM dia HDPE Pipe 160 1.94
7 200MM dia HDPE Pipe 200 1.12
HSC Connection
Sno. Total Nos.
1 684
Other Details
3.62
3.65
3.65
06-Oct-2026
07-Oct-2026