Project Completion Certificate (Ground Water)
Scheme ID: 20047599 Name of Scheme: MUBARAKPUR MARAILA Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2190 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Nov-2023 Actual Date of Completion (Capex): 21-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell assembly 18/106.30 Mubarakpur Maraila 26.376945 82.576694
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pumping 10.0 HP 500 Mubarakpur Maraila 26.38 82.58
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125/14 Mubarakpur Maraila 26.376 82.576
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.213
2 HDPE Pipe PN-6: Class PE-100 75 2.044
3 HDPE Pipe PN-6: Class PE-100 90 0.427
4 HDPE Pipe PN-6: Class PE-100 110 1.987
5 HDPE Pipe PN-6: Class PE-100 140 0.091
HSC Connection
Sno. Total Nos.
1 276
Other Details
1.82
1.79
1.79
20-Dec-2024
21-Dec-2024