Project Completion Certificate (Ground Water)
Scheme ID: 20047603 Name of Scheme: PARAS KATUI Water Supply Scheme No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 3460 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 03-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 24/53.77 PARAS KATUI 26.403240 82.691
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 15 HP 750 LPM /46 PARAS KATUI. 26.403170 82.690980
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200KL/ 16Mtr PARAS KATUI. 26.403170 82.690980
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI (K7) 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 75 3.4412
2 HDPE Pipe PN-6: Class PE-100 90 1.1803
3 HDPE Pipe PN-6: Class PE-100 110 1.1003
4 HDPE Pipe PN-6: Class PE-100 63 14.398
5 HDPE Pipe PN-6: Class PE-100 140 2.026
6 HDPE Pipe PN-6: Class PE-100 160 0.016
HSC Connection
Sno. Total Nos.
1 529
Other Details
2.82
2.93
2.93
03-Apr-2025
04-Apr-2025