Project Completion Certificate (Ground Water)
Scheme ID: 20047607 Name of Scheme: BHADYA Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 3220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 30M/56.80M Bhadya 26.318758 83.100333
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 700LPM/44M Bhadya 26.318758 83.100333
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200KL/14MTR Bhadya 26.318758 83.100333
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.248
2 HDPE Pipe PN-6: Class PE-100 75 4.349
3 HDPE Pipe PN-6: Class PE-100 63 10.323
4 HDPE Pipe PN-6: Class PE-100 110 0.678
5 HDPE Pipe PN-6: Class PE-100 125 0.395
6 HDPE Pipe PN-6: Class PE-100 140 0.270
7 HDPE Pipe PN-6: Class PE-100 160 0.335
8 HDPE Pipe PN-6: Class PE-100 180 0.104
9 HDPE Pipe PN-6: Class PE-100 200 0.056
HSC Connection
Sno. Total Nos.
1 455
Other Details
2.61
2.60
2.60
16-May-2025
17-May-2025