Project Completion Certificate (Ground Water)
Scheme ID: 20047636 Name of Scheme: LAKHANDEEH Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4180 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Nov-2023 Actual Date of Completion (Capex): 15-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Borewell Assembly 30.00M/74.30M Lakhandeeh 26.4232 82.924184
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 900LPM/45M Lakhandeeh 26.4232 82.924184
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250KL/14M Lakhandeeh 26.4232 82.924184
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.244
2 HDPE Pipe PN-6: Class PE-100 75 1.199
3 HDPE Pipe PN-6: Class PE-100 63 11.857
4 HDPE Pipe PN-6: Class PE-100 110 0.669
5 HDPE Pipe PN-6: Class PE-100 140 2.085
6 HDPE Pipe PN-6: Class PE-100 160 0.237
7 HDPE Pipe PN-6: Class PE-100 180 0.308
8 HDPE Pipe PN-6: Class PE-100 200 0.369
HSC Connection
Sno. Total Nos.
1 530
Other Details
2.80
2.87
2.87
23-Jul-2026
22-Jul-2026