Project Completion Certificate (Ground Water)
Scheme ID: 20047639 Name of Scheme: KEDRUPUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 24-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 18M/76.55M Kedrupur 26.400407 83.027622
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10HP Submersible Pump 500LPM/45M Kedrupur 26.400407 83.027622
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 150KL/14MTR Kedrupur 26.400407 83.027622
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.04 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.600
2 HDPE Pipe PN-6: Class PE-100 75 1.564
3 HDPE Pipe PN-6: Class PE-100 63 6.096
4 HDPE Pipe PN-6: Class PE-100 110 0.504
5 HDPE Pipe PN-6: Class PE-100 125 0.373
6 HDPE Pipe PN-6: Class PE-100 140 1.036
7 HDPE Pipe PN-6: Class PE-100 160 0.017
HSC Connection
Sno. Total Nos.
1 375
Other Details
2.00
2.00
2.00
27-Jul-2025
28-Jul-2025