Project Completion Certificate (Ground Water)
Scheme ID: 20047657 Name of Scheme: SAMDEEH Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 5060 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Nov-2023 Actual Date of Completion (Capex): 21-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Borewell Assembly 36.00M/ 50.30M Samdeeh 26.350376 82.978126
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP Submersible Pump 1100 LPM/ 45 M Samdeeh 26.350376 82.978126
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 325KL/14M Samdeeh 26.350376 82.978126
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 200 0.0285
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.997
2 HDPE Pipe PN-6: Class PE-100 75 0.730
3 HDPE Pipe PN-6: Class PE-100 63 31.170
4 HDPE Pipe PN-6: Class PE-100 125 0.715
5 HDPE Pipe PN-6: Class PE-100 140 1.863
6 HDPE Pipe PN-6: Class PE-100 160 0.200
7 HDPE Pipe PN-6: Class PE-100 180 0.411
8 HDPE Pipe PN-6: Class PE-100 200 1.593
HSC Connection
Sno. Total Nos.
Other Details
4.13
4.13
4.13
23-Jul-2026
24-Jul-2026