Project Completion Certificate (Ground Water)
Scheme ID: 20047661 Name of Scheme: SAHABUDDINPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2310 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Sep-2023 Actual Date of Completion (Capex): 21-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering Of Tubewells Assembly 18.08 M/ 64.27 M SAHABUDDINPUR 26.394105 83.007853
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP submersible pump 500 LPM/ 45 M SAHABUDDINPUR 26.394105 83.007853
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 15OKL/14MTR SAHABUDDINPUR 26.394105 83.007853
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.750
2 HDPE Pipe PN-6: Class PE-100 75 1.1704
3 HDPE Pipe PN-6: Class PE-100 63 10.706
4 HDPE Pipe PN-6: Class PE-100 110 0.540
5 HDPE Pipe PN-6: Class PE-100 140 0.288
HSC Connection
Sno. Total Nos.
1 295
Other Details
1.91
1.99
1.99
21-Mar-2025
22-Mar-2025