Project Completion Certificate (Ground Water)
Scheme ID: 20048038 Name of Scheme: Khalilullahpur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3142 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 35.08/116.33 KHALILULLAHPUR 29.598148 78.099433
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 680/52 KHALILULLAHPUR 29.598148 78.099433
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 KHALILULLAHPUR 29.598148 78.099433
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 150 0.044
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.1395
2 HDPE 75 0.1617
3 HDPE 90 0.6853
4 HDPE 110 0.1693
5 HDPE 125 0.103
6 HDPE 140 0.1297
7 HDPE 160 0.0651
8 HDPE 180 0.04
HSC Connection
Sno. Total Nos.
1 438
Other Details
2.15
0.00
2.15
19-Nov-2024
20-Nov-2024