| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20048086 | Name of Scheme: SAGARTHALI AND CHAUPURA MOLVI MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1972 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 02-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 18.06/96.5 | Sagarthali | 28.5243 | 78.1335 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 400/43 | Sagarthali | 28.5243 | 78.1335 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 125/12 | Sagarthali | 28.5244 | 78.13357 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.025 | Installed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 63 | 5.78750 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.2154 | |
| 3 | PN-6 PE100/HDPE | 90 | 0.3626 | |
| 4 | PN-6 PE100/HDPE | 125 | 0.2093 | |
| 5 | PN-6 PE100/HDPE | 140 | 0.082 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 368 |