Project Completion Certificate (Ground Water)
Scheme ID: 20048094 Name of Scheme: TUKLABAD AND NOORPUR KALAN MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2296 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 26-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.0/108.64 Tuklakabad 28.7554 78.4039
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 392/49 Tuklakabad 28.7554 78.4039
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 200/12 Tuklakabad 28.7553 78.4037
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 125 0.0134
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.2057
2 PN-6 PE100/HDPE 75 4.9227
3 PN-6 PE100/HDPE 63 3.3814
4 PN-6 PE100/HDPE 110 0.7459
5 PN-6 PE100/HDPE 125 0.2443
6 PN-6 PE100/HDPE 140 0.103
7 PN-6 PE100/HDPE 160 0.114
8 PN-6 PE100/HDPE 180 1.2954
HSC Connection
Sno. Total Nos.
1 753
Other Details
2.52
0.00
2.38
10-Apr-2026
11-Apr-2026