| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20048687 | Name of Scheme: Asrafpur Faizganj Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3190 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.00/93.17 | Asrafpur Faizganj | 28.786645 | 78.542245 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 660/42 | Asrafpur Faizganj | 28.786645 | 78.542245 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 200/12 | Asrafpur Faijganj | 28.78674499 | 78.5424996 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 150 | 0.0278 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.450 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.403 | |
| 3 | PN-6 PE100/HDPE | 63 | 6.3115 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.149 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.040 | |
| 6 | PN-6 PE100/HDPE | 140 | 0.066 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.1295 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 466 |