Project Completion Certificate (Ground Water)
Scheme ID: 20049264 Name of Scheme: HARYANA SINGLE VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3778 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 10-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.04/114.38 Haryana 28.7091 78.4063
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 754/65 Haryana 28.7091 78.4063
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 225/12 Haryana 2.87092 78.4062
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 150 0.02570
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.8495
2 PN-6 PE100/HDPE 75 3.213
3 PN-6 PE100/HDPE 63 3.1367
4 PN-6 PE100/HDPE 110 0.3418
5 PN-6 PE100/HDPE 125 0.2473
6 PN-6 PE100/HDPE 140 0.1374
7 PN-6 PE100/HDPE 160 0.1254
8 PN-6 PE100/HDPE 180 0.3402
HSC Connection
Sno. Total Nos.
1 677
Other Details
2.23
0.00
2.23
24-Feb-2026
25-Feb-2026