| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20049799 | Name of Scheme: RASAHARA | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3050 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Dec-2022 | Actual Date of Completion (Capex): 22-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 124.25 | RASAHARA | 26.809134 | 83.039872 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 700 LPM / 42 M | RASAHARA | 26.809134 | 83.039872 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 14 M | RASAHARA | 26.80873 | 83.040086 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/ K9 | 150 | 0.032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PE 100 PN 6/ HDPE | 63 | 8.486 | |
| 2 | PE 100 PN 6/ HDPE | 75 | 2.174 | |
| 3 | PE 100 PN 6/ HDPE | 90 | 1.080 | |
| 4 | PE 100 PN 6/ HDPE | 110 | 1.431 | |
| 5 | PE 100 PN 6/ HDPE | 140 | 0.069 | |
| 6 | PE 100 PN 6/ HDPE | 180 | 0.152 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 384 |