Project Completion Certificate (Ground Water)
Scheme ID: 20050181 Name of Scheme: PANTHRA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4077 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 10-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.00/129.30 PANTHRA 27.199012 79.461419
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 850/63 PANTHRA 27.199012 79.461419
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 PANTHRA 27.199012 79.461419
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 RISING MAINS
2 DI 150 0.01950 RISING MAINS
3 DI 200 0.0105 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.603 DISTRIBUTION
2 HDPE 63 10.576 DISTRIBUTION
3 HDPE 110 0.372 DISTRIBUTION
4 HDPE 140 1.075 DISTRIBUTION
5 HDPE 160 0.413 DISTRIBUTION
6 HDPE 180 1.018 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 820
Other Details
3.94
3.89
3.94
13-Jul-2024
14-Jul-2024