| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20050183 | Name of Scheme: JASUA MAI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1861 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-Jun-2024 | Actual Date of Completion (Capex): 06-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 14.68/99.68 | Jasua Mai | 79.547524 | 27.143233 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 | 400 LPM/59 M | Jasua Mai | 79.547524 | 27.143233 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/ 12 M | Jasua Mai | 79.547524 | 27.143233 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | .0315 | Rising main |
| 2 | DI | 150 | 0.0045 | Rising main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.6714 | Distribution |
| 2 | HDPE | 63 | 2.7451 | Distribution |
| 3 | HDPE | 110 | .0990 | Distribution |
| 4 | HDPE | 140 | .4908 | Distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 397 |