Project Completion Certificate (Ground Water)
Scheme ID: 20050531 Name of Scheme: BAISABARI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2725 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 28-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.00/87.32 BAISABARI 27.090286 79.564973
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 600 LPM/71 M BAISABARI 27.090286 79.564973
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 M BAISABARI 27.090286 79.564973
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 Rising main
2 DI 100 0.0285 Rising main
3 DI 150 0.0059 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.78 Distribution
2 HDPE 63 4.16 Distribution
3 HDPE 100 0.621 Distribution
4 HDPE 140 0.795 Distribution
HSC Connection
Sno. Total Nos.
1 619
Other Details
2.76
2.68
2.76
31-Jul-2024
01-Aug-2024