Project Completion Certificate (Ground Water)
Scheme ID: 20050537 Name of Scheme: PAURAUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4735 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 04-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34.03/129.31 PARAUR 79.43514 27.03632
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 1000 LPM/63 M PARAUR 79.43514 27.03632
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 16 M PARAUR 79.43514 27.03632
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0185 Rising main
2 DI 200 0.005 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.39 Distribution
2 HDPE 63 6.85 Distribution
3 HDPE 110 1.70 Distribution
4 HDPE 140 1.41 Distribution
5 HDPE 160 1.75 Distribution
6 HDPE 180 0.533 Distribution
HSC Connection
Sno. Total Nos.
1 901
Other Details
4.38
4.29
4.38
07-Feb-2025
08-Feb-2025