| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20050587 | Name of Scheme: AZAM BAGH GP RWSS | No. of Villages: 5 | No. of Habitation Covered: 9 |
| Total Population Covered: 3855 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 07-May-2024 | Actual Date of Completion (Capex): 22-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.04/101.98 | AZAMBAGH | 25.96704 | 83.213855 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 600/48 | AZAMBAGH | 25.96704 | 83.213855 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/14 | AZAMBAGH | 25.96704 | 83.213855 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI PIPE | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 5.392 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.683 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.477 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.510 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.728 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 2.247 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.145 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 422 |