Project Completion Certificate (Ground Water)
Scheme ID: 20050628 Name of Scheme: BANMAIE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2500 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 10-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00/156.80 Banmaie 26.31941 82.183689
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPUMP-1 510LPM/45M Banmaie 26.31941 82.183689
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M Banmaie 26.31941 82.183689
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K7 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.963
2 HDPE Pipe PN-6: Class PE-100 75 1.609
3 HDPE Pipe PN-6: Class PE-100 90 1.886
4 HDPE Pipe PN-6: Class PE-100 110 0.617
5 HDPE Pipe PN-6: Class PE-100 140 0.088
6 HDPE Pipe PN-6: Class PE-100 160 0.467
HSC Connection
Sno. Total Nos.
1 520
Other Details
2.11
0.00
2.05
02-Feb-2026
03-Feb-2026