Project Completion Certificate (Ground Water)
Scheme ID: 20050767 Name of Scheme: Simtamau No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1880 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.9805 As per Site
2 HDPE 75 1.186 As per Site
3 HDPE 90 1.010 As per Site
4 HDPE 110 0.697 As per Site
5 HDPE 140 0.910 As per Site
6 HDPE 160 0.731 As per Site
7 HDPE 180 0.217 As per Site
HSC Connection
Sno. Total Nos.
Other Details
1.65
1.93
1.93
30-Jun-2023
01-Jul-2023