Project Completion Certificate (Ground Water)
Scheme ID: 20051034 Name of Scheme: PANSOLI MUSTQIL GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3696 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 20-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Drilling of Tubewell 30.08/103.71 Pansoli Mustqil 28.6504945 79.7603776
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 10HP 550/33.6 Pansoli Mustqil 28.6504945 79.7603776
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Over Head Tank 150/12 Pansoli Mustqil 28.6504945 79.7603776
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 160 0.078
2 HDPE Pipe PN-6: Class PE-100 140 0.298
3 HDPE Pipe PN-6: Class PE-100 110 0.13
4 HDPE Pipe PN-6: Class PE-100 90 0.234
5 HDPE Pipe PN-6: Class PE-100 75 0.535
6 HDPE Pipe PN-6: Class PE-100 63 4.335
HSC Connection
Sno. Total Nos.
1 502
Other Details
2.18
2.18
2.10
05-Nov-2024
06-Nov-2024