| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20051200 | Name of Scheme: GOPALAPUR JJM SCHEME | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3812 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Apr-2023 | Actual Date of Completion (Capex): 20-Jan-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 800 LPM / 46 M | Gopalapur | 28.116916 | 80.622375 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 800 LPM / 46 M | Gopalapur | 28.116916 | 80.622375 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 KL/ 16 Mtr | Gopalapur | 28.116916 | 80.622375 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe ?-7 | 125 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.105 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.0528 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.5605 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.9142 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 63 | 10.3594 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 600 |