Project Completion Certificate (Ground Water)
Scheme ID: 20051332 Name of Scheme: DEHARI VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 3021 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Dec-2023 Actual Date of Completion (Capex): 26-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 9m/47.23m Dehari 26.061845 82.57656
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5HP 592LPM/44m Dehari 26.061845 82.57656
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/12M Dehari 26.061901 82.576604
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.02615 yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.939 Yes
2 HDPE 75 2.933 Yes
3 HDPE 63 4.753 Yes
4 HDPE 110 0.762 Yes
5 HDPE 140 0.781 Yes
6 HDPE 160 0.468 Yes
7 HDPE 180 0.463 Yes
8 HDPE 200 0.132 Yes
HSC Connection
Sno. Total Nos.
1 368
Other Details
2.32
2.32
1.97
26-Feb-2025
26-Feb-2025