Project Completion Certificate (Ground Water)
Scheme ID: 20051662 Name of Scheme: PURSHOTTAMPUR No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 5270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Oct-2025 Actual Date of Completion (Capex): 01-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 8.05
2 HDPE PIPE PN -6: CLASS PE -100 75 0.74
3 HDPE PIPE PN -6: CLASS PE -100 90 0.90
4 HDPE PIPE PN -6: CLASS PE -100 110 0.90
5 HDPE PIPE PN -6: CLASS PE -100 140 0.57
6 HDPE PIPE PN -6: CLASS PE -100 160 0.50
HSC Connection
Sno. Total Nos.
1 634
Other Details
2.68
2.68
2.58
28-Feb-2025
01-Mar-2025