Project Completion Certificate (Ground Water)
Scheme ID: 20051757 Name of Scheme: Salawat Nagar Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4425 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Feb-2026 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 1500 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 6.91
2 HDPE PIPE PN -6: CLASS PE -100 75 1.04
3 HDPE PIPE PN -6: CLASS PE -100 90 0.48
4 HDPE PIPE PN -6: CLASS PE -100 110 1.25
5 HDPE PIPE PN -6: CLASS PE -100 125 0.06
6 HDPE PIPE PN -6: CLASS PE -100 160 0.16
7 HDPE PIPE PN -6: CLASS PE -100 180 0.11
HSC Connection
Sno. Total Nos.
Other Details
2.94
2.94
2.76
31-Mar-2026
01-Apr-2026