Project Completion Certificate (Ground Water)
Scheme ID: 20051760 Name of Scheme: NANGALI CHOIYA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3664 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Mar-2025 Actual Date of Completion (Capex): 01-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 3.34
2 HDPE PIPE PN -6: CLASS PE -100 75 0.33
3 HDPE PIPE PN -6: CLASS PE -100 90 0.46
4 HDPE PIPE PN -6: CLASS PE -100 110 0.45
5 HDPE PIPE PN -6: CLASS PE -100 125 0.30
6 HDPE PIPE PN -6: CLASS PE -100 160 0.04
7 HDPE PIPE PN -6: CLASS PE -100 200 0.28
HSC Connection
Sno. Total Nos.
Other Details
1.87
1.87
1.86
31-Oct-2025
01-Nov-2025