Project Completion Certificate (Ground Water)
Scheme ID: 20053031 Name of Scheme: Nibauli bujurg No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2943 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Nov-2023 Actual Date of Completion (Capex): 21-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 22.16/218.32 NIBAULI BUJURG 26.4233704 79.9795908
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 650/70 NIBAULI BUJURG 26.4233704 79.9795908
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 NIBAULI BUJURG 26.4233704 79.9795908
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.01760
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.979
2 HDPE 90 3.227
3 HDPE 110 1.670
4 HDPE 125 0.464
5 HDPE 140 0.499
HSC Connection
Sno. Total Nos.
1 612
Other Details
3.28
0.00
2.72
22-Mar-2024
23-Mar-2024