Project Completion Certificate (Ground Water)
Scheme ID: 20053080 Name of Scheme: AURANGABAD DALCHAND No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3055 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 15-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 28.14/178.27 AURANGABAD DALCHAND 26.5548 79.67596
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 650/62 AURANGABAD DALCHAND 26.5548 79.67596
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 AURANGABAD DALCHAND 26.5548 79.67596
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0078
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.531
2 HDPE 90 1.447
3 HDPE 110 0.732
4 HDPE 125 2.008
5 HDPE 140 0.270
6 HDPE 160 0.913
7 HDPE 180 1.596
HSC Connection
Sno. Total Nos.
1 569
Other Details
3.48
0.00
2.85
22-Mar-2024
23-Mar-2024