Project Completion Certificate (Ground Water)
Scheme ID: 20053094 Name of Scheme: Kaprahat No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4703 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 15-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 33.17/217.24 KAPRAHAT 26.59393 79.89358
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 1000/64 KAPRAHAT 26.59393 79.89358
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/18 KAPRAHAT 26.59393 79.89358
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0137
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.857
2 HDPE 90 2.406
3 HDPE 110 1.983
4 HDPE 125 1091
5 HDPE 140 0.702
6 HDPE 160 1.080
7 HDPE 180 0.671
HSC Connection
Sno. Total Nos.
Other Details
4.49
0.00
3.75
22-Mar-2024
23-Mar-2024