Project Completion Certificate (Ground Water)
Scheme ID: 20053215 Name of Scheme: KAMIR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3401 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Sep-2023 Actual Date of Completion (Capex): 09-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 30.39/167.96 KAMIR 26.60714 79.91756
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 700/73 KAMIR 26.60714 79.91756
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 KAMIR 26.60714 79.91756
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.897
2 HDPE 90 1.409
3 HDPE 110 0.615
4 HDPE 125 1.277
5 HDPE 140 0.411
6 HDPE 160 1.145
HSC Connection
Sno. Total Nos.
1 618
Other Details
3.86
3.82
2.55
09-Jan-2024
10-Dec-2024