Project Completion Certificate (Ground Water)
Scheme ID: 20053230 Name of Scheme: Devgaon Chakkar Urf Nibhoo No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2527 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 30-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 24 M/164.33 M DEVGAON CHAKAR URF NIBHOO 26.4214 N 79.4843 E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 650/60 DEVGAON CHAKAR URF NIBHOO 26.4214 N 79.4843 E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 DEVGAON CHAKAR URF NIBHOO 26.4214 N 79.4843 E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.151
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.038
2 HDPE 90 2.716
3 HDPE 110 0.725
4 HDPE 125 0.594
5 HDPE 140 0.968
6 HDPE 160 0.542
HSC Connection
Sno. Total Nos.
1 511
Other Details
3.09
0.00
2.54
23-Mar-2024
24-Mar-2024