Project Completion Certificate (Ground Water)
Scheme ID: 20053260 Name of Scheme: Makrandpur Kahinjari No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3529 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 10-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 30.40/ 182.47 MAKRANDPUR KAHINJARI 26.60985 N 79.89762 E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 850/62 MAKRANDPUR KAHINJARI 26.60985 N 79.89762 E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 MAKRANDPUR KAHINJARI 26.60985 N 79.89762 E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.350
2 HDPE 90 2.484
3 HDPE 110 0.559
4 HDPE 125 0.403
5 HDPE 140 0.579
6 HDPE 160 0.106
7 HDPE 180 1.813
HSC Connection
Sno. Total Nos.
1 866
Other Details
4.24
0.00
3.48
12-Jan-2024
13-Jan-2024